Top Data Center Stocks for AI Infrastructure

“Top data center stocks for AI infrastructure” is a search that means something different in 2026 than it did in 2024, and the difference is the investable story. The first wave paid the scale suppliers: the chipmaker, the server assembler, the power-equipment maker. The current wave, as framed by Marc Chaikin’s “The End of Elon?” presentation, pays the builders of a different kind of data center, smaller, precision-focused, and government-anchored. Here is the map of both layers, and how the pieces fit together.

Layer one: the proven scale winners

The evidence set from the 2024 buildout, quoted across the current presentations, tells you who already won the scale phase. Micron “soared 970% in a year” on memory. Celestica “shot up more than 6,600% on the AI infrastructure boom.” Vertiv climbed “+586%” on thermal and power equipment. Constellation Energy, “+149%”, and Bloom Energy, “+2,074%”, on the power side. Nvidia, flagged bullish by Chaikin’s Power Gauge “back in 2014… before it skyrocketed more than 50,000%,” remains the reference point everyone measures against. These are the incumbents, and they are not going away: the campuses they supply, Elon Musk’s Colossus among them at “1,156 acres” and roughly two gigawatts, still train the frontier models.

Layer two: the precision buildout

What changed entering 2026 is the arrival of a second class of AI infrastructure with different economics. The Department of Energy is assembling FP64-powered AI supercomputers, machines that do scientific-grade double-precision work the FP16 training campuses cannot honestly perform. The first, Lux, is being built at Oak Ridge National Laboratory: “the world’s first FP64-powered AI supercomputer… about the area of a 7-Eleven convenience store… Literally 0.001% the size of Colossus,” drawing “as little as 24 megawatts,” expected to fire up “before the end of this year.” Lux seeds a network of nine new micro clusters plus “more than 50” converted DOE supercomputers, “Frontier, El Capitan, Aurora, Tuolumne, Venado, Perlmutter, Crossroads, and Polaris,” linked into what Chaikin names American Atlas, claimed to deliver “a sudden 360-fold acceleration in major AI-powered breakthroughs.”

The stock list for this layer is Chaikin’s “The American Atlas Portfolio: Top Stocks to Profit from the Dawn of AI Superclusters,” covering “17 companies that have signed deals… They’re all working directly on building American Atlas.” The free entry point he names: “It’s the first company on my American Atlas ‘buy’ list… Advanced Micro Devices, ticker symbol AMD,” whose Instinct accelerators already power Frontier and El Capitan, with “at least $1 billion dollars about to hit this company’s account.” The portfolio’s first teased non-AMD pick is a networking company providing “advanced networking solutions… The unsexy stuff that will make the next stage of the AI revolution possible,” with “the market hasn’t priced in the firm’s massive potential.”

The American Atlas Portfolio report cover from the presentation

Layer three: power and construction

The constraint that never left the thesis is electricity: the IEA projects data-center power use doubling “to around 945 terawatts” by 2030, and electric bills have risen “by an average of 267% in areas with high data-center concentrations.” That keeps the power and construction tier investable across both layers, and it is why hyperscalers are signing decade-plus power offtakes, with one of the parallel resource-boom picks being “a West Texas AI driller that just penned a deal with a massive tech firm to supply power to one of its data centers for the next two decades.”

The honest selection frame

Two cautions for anyone building a basket. First, the quoted gains are maximum historical outcomes from the best names of the last cycle, and the presentation’s own hedge, “Past performance is no guarantee of future results,” is the sentence to weight. Second, the layers coexist: FP64 scientific machines and FP16 training campuses solve different problems, so the “rotation” is additive, not a replacement trade. Chaikin’s formulation for holders of the incumbents is the balanced one: “What I’m showing you today is a different layer of the same opportunity. I want you to have both.”

Questions readers ask

What splits the 2026 data-center trade? Precision. The consumer-inference buildout, Colossus-class at 2 gigawatts a site, and the scientific-computing buildout, Oak Ridge-class FP64 machines at 24 megawatts with a 7-Eleven footprint, are two different equipment lists. The American Atlas thesis says the second is where the repricing happens as the DOE network of nine AI micro clusters plus more than 50 converted supercomputers comes online.

What are the named channels? AMD free, grounded in Instinct accelerators already powering Frontier and El Capitan. The 17-company American Atlas Portfolio behind the $499-anchored Power Gauge Report subscription, covering companies the presentation says have signed deals to work directly on the network. The “landmine” report on the other side, covering names priced for the FP16 regime.

What should honest investors add to the excitement? The caveats in the presentation itself. The $248 trillion figure is an aggregation of sector forecasts, not an addressable market; the September 29th date has no stated source; and the “360-fold acceleration” claim, from one mile per hour to 360, is a presenter characterization of the speed difference between FP16 and FP64 computing. The DOE buildout is the real, checkable core. Our full review covers it all.

Where to learn more

Start with our End of Elon? American Atlas review, then the supercluster stock universe and the data center energy problem. The full presentation and the 17-company portfolio offer are at the Chaikin Analytics page, discounted from $499 with a 30-day refund guarantee.

NewsletterVetter is an independent publication. We receive compensation from some of the services we review through affiliate links. Nothing on this site is investment advice. Always do your own research.